S.R. 429 construction commences in Winter Garden

Travel lanes are being added in each direction on State Road 429.


  • West Orange Times & Observer
  • News
  • Share

The Central Florida Expressway Authority began construction activities May 31 on State Road 429 from Tilden Road to south of Florida’s Turnpike to improve traffic flow and reduce congestion.
This 3.6-mile SR 429 Capacity Improvements Project (Segment 1) will add a travel lane in each direction, expanding the expressway from four to six lanes (three travel lanes in each direction). In addition, wider median shoulders to temporarily accommodate traffic during emergency response events are being added.

Ten sound walls also are planned for this segment.
During construction, temporary lane and ramp closures will be necessary to accommodate work. Daytime operations, including pile driving, are scheduled from 7 a.m. to 5 p.m., while night work is scheduled from 8:30 p.m. to 6 a.m.
For more, contact Kevin Camara, CFX public information officer, at (407) 383-5817 or [email protected].

 

author

Amy Quesinberry

Community Editor Amy Quesinberry was born at the old West Orange Memorial Hospital and raised in Winter Garden. Aside from earning her journalism degree from the University of Georgia, she hasn’t strayed too far from her hometown and her three-mile bubble. She grew up reading The Winter Garden Times and knew in the eighth grade she wanted to write for her community newspaper. She has been part of the writing and editing team since 1990.

Latest News